ADC121C021EVM

Mfr. #: ADC121C021EVM
Manufacturer: Texas Instruments
Description: Data Conversion IC Development Tools Demo kit for ADC121C021
Lifecycle: New from this manufacturer.
Datasheet: ADC121C021EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC121C021EVM Overview

This product is manufactured by Texas Instruments. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.046911 oz of Unit Weight

ADC121C021EVM Image

ADC121C021EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC121C021EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Packaging: Bulk
  • Series: ADC121C021
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.046911 oz

ADC121C021EVM

ADC121C021EVM Specifications

ADC121C021EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.046911 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top