| Mfr. #: | ADC12J4000EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | Data Conversion IC Development Tools ADC12J4000 Eval Module |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | ADC12J4000EVM Datasheet |


This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.568577 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC12J4000EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Product Type?
Q: The product Product Type is Data Conversion IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.568577 oz