ADC16DX370EVM

Mfr. #: ADC16DX370EVM
Manufacturer: Texas Instruments
Description: Data Conversion IC Development Tools ADC16DX370EVM
Lifecycle: New from this manufacturer.
Datasheet: ADC16DX370EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC16DX370EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 4 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB Compatible with ADC16DX370. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADC16DX370EVM Image

ADC16DX370EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC16DX370EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • Shipping Restrictions:
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADC16DX370
  • Operating Supply Voltage: 4 V
  • Description/Function: dual-channel, 16-bit ADC capable of operating at sampling rates up to 370 MSPs
  • Series: ADC16DX370
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • For Use With: ADC16DX370
  • Operating Supply Current: 2 A
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADC16DX370EVM

ADC16DX370EVM Specifications

ADC16DX370EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 4 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SPI, USB.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is ADC16DX370.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top