| Mfr. #: | ADC34J23EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | Data Conversion IC Development Tools ADC34J23EVM |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | ADC34J23EVM Datasheet |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 1.8 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: JESD204B Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.276451 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC34J23EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: What is the Type of the product?
Q: The Type of the product is ADC.
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 1.8 V.
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is JESD204B.
A: At what frequency does the Product Type?
Q: The product Product Type is Data Conversion IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 0.276451 oz.