ADS4225EVM

Mfr. #: ADS4225EVM
Manufacturer: Texas Instruments
Description: Data Conversion IC Development Tools ADS4225 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: ADS4225EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4225EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: Serial Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS4225EVM Image

ADS4225EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4225EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: ADC
  • Tool Is For Evaluation Of: ADS4225
  • Operating Supply Voltage: 5 V
  • Series: ADS4225
  • Brand: Texas Instruments
  • Interface Type: Serial
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS4225EVM

ADS4225EVM Specifications

ADS4225EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is Serial.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top