ADS5474ADX-EVM

Mfr. #: ADS5474ADX-EVM
Manufacturer: Texas Instruments
Description: Data Conversion IC Development Tools 800MSPS Digitizer Sol Eval Module
Lifecycle: New from this manufacturer.
Datasheet: ADS5474ADX-EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5474ADX-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. Texas Instruments is a trusted brand for quality electronics Interface Type: SMA, USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS5474ADX-EVM Image

ADS5474ADX-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5474ADX-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: ADC
  • Tool Is For Evaluation Of: ADS5474
  • Brand: Texas Instruments
  • Interface Type: SMA, USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS5474ADX-EVM

ADS5474ADX-EVM Specifications

ADS5474ADX-EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed SMA, USB

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top