ADS8320EVM-PDK

Mfr. #: ADS8320EVM-PDK
Manufacturer: Texas Instruments
Description: Data Conversion IC Development Tools ADS8320 Perf Dev Kit
Lifecycle: New from this manufacturer.
Datasheet: ADS8320EVM-PDK Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8320EVM-PDK Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. 1.8 V to 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS8320EVM-PDK Image

ADS8320EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8320EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: ADC
  • Tool Is For Evaluation Of: ADS8320
  • Operating Supply Voltage: 1.8 V to 5 V
  • Series: ADS8320
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS8320EVM-PDK

ADS8320EVM-PDK Specifications

ADS8320EVM-PDK FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1.8 V to 5 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top