ADS8678EVM-PDK

Mfr. #: ADS8678EVM-PDK
Manufacturer: Texas Instruments
Description: Data Conversion IC Development Tools ADS8678EVM-PDK
Lifecycle: New from this manufacturer.
Datasheet: ADS8678EVM-PDK Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8678EVM-PDK Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: GUI, SPI, USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS8678EVM-PDK Image

ADS8678EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8678EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS8678
  • Operating Supply Voltage: 5 V
  • Packaging: Bulk
  • Description/Function: 8-channel, integrated, 14-bit SAR ADC with alarm
  • Series: ADS8698
  • Brand: Texas Instruments
  • Interface Type: GUI, SPI, USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS8678EVM-PDK

ADS8678EVM-PDK Specifications

ADS8678EVM-PDK FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is GUI, SPI, USB.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top