AFE5803EVM

Mfr. #: AFE5803EVM
Manufacturer: Texas Instruments
Description: Multiple Function Sensor Development Tools AFE5803EVM
Lifecycle: New from this manufacturer.
Datasheet: AFE5803EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5803EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Interface Type: SPI The product can operate at a maximum temperature of + 70 C. Multiple Function Sensor Development Tools product type 1 of 100 Development Tools as subcategory

AFE5803EVM Image

AFE5803EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5803EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Multiple Function Sensor Development Tools
  • RoHS: N/A
  • Series: AFE5803
  • Brand: Texas Instruments
  • Interface Type: SPI
  • Maximum Operating Temperature: + 70 C
  • Product Type: Multiple Function Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

AFE5803EVM

AFE5803EVM Specifications

AFE5803EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed SPI

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 70 C

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Multiple Function Sensor Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top