| Mfr. #: | BOOSTXL-DRV8305EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | Power Management IC Development Tools BOOSTXL-DRV8305EVM |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | BOOSTXL-DRV8305EVM Datasheet |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 4.4 V to 45 V Input Voltage Bulk packaging for easy dispensing Output current: 15 A Texas Instruments is a trusted brand for quality electronics Interface Type: SPI Compatible with CSD18540Q5A, LMR16006. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's BoosterPack is Blue Gecko. 1. 6.589176 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BOOSTXL-DRV8305EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Motor / Motion Controllers & Drivers.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 4.4 V to 45 V.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 15 A
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: Is the cutoff frequency of the product Interface Type?
Q: Yes, the product's Interface Type is indeed SPI
A: What is the For Use With of the product?
Q: The For Use With of the product is CSD18540Q5A, LMR16006.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: What is the Tradename of the product?
Q: The Tradename of the product is BoosterPack.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 6.589176 oz