BQ24157EVM-697

Mfr. #: BQ24157EVM-697
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools BQ24157 EVAL MOD
Lifecycle: New from this manufacturer.
Datasheet: BQ24157EVM-697 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24157EVM-697 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 5 V Input Voltage Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Compatible with BQ24157. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ24157EVM-697 Image

BQ24157EVM-697

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24157EVM-697 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ24157
  • Input Voltage: 5 V
  • Description/Function: BQ24157EVM-697 evaluation module
  • Series: BQ24157
  • Brand: Texas Instruments
  • Interface Type: I2C
  • For Use With: BQ24157
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ24157EVM-697

BQ24157EVM-697 Specifications

BQ24157EVM-697 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Battery Management

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 5 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is BQ24157.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top