| Mfr. #: | BQ24297EVM-021 |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | Power Management IC Development Tools BQ24297 EVAL MOD |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | BQ24297EVM-021 Datasheet |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 5 V Input Voltage Output Voltage is 3.7 V Output current: 4 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is 0 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.343516 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24297EVM-021 Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Battery Management
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 5 V
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 3.7 V
A: What is the Output Current of the product?
Q: The Output Current of the product is 4 A.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is I2C.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 125 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is 0 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 0.343516 oz.