| Mfr. #: | BQ50002EVM-607 |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | Power Management IC Development Tools w/NVSRAM Control Watchdog Timer |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | BQ50002EVM-607 Datasheet |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Wireless Charging - Transmitters type. 5 V Input Voltage Output Voltage is 5 V Output current: 1.5 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ50002EVM-607 Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Wireless Charging - Transmitters
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 5 V.
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 5 V
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 1.5 A
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: Is the cutoff frequency of the product Interface Type?
Q: Yes, the product's Interface Type is indeed I2C, USB
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.