BQ51025EVM-649

Mfr. #: BQ51025EVM-649
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools bq51025 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: BQ51025EVM-649 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ51025EVM-649 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 20 V Input Voltage Output Voltage is 4.5 V to 10 V Output current: 2 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Compatible with BQ51025. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ51025EVM-649 Image

BQ51025EVM-649

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ51025EVM-649 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ51025
  • Input Voltage: 20 V
  • Output Voltage: 4.5 V to 10 V
  • Description/Function: Evaluation module demonstrates the receiver portion of the wireless power system
  • Output Current: 2 A
  • Series: BQ500215
  • Brand: Texas Instruments
  • Interface Type: I2C
  • For Use With: BQ51025
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ51025EVM-649

BQ51025EVM-649 Specifications

BQ51025EVM-649 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 20 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 4.5 V to 10 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 2 A

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is BQ51025.

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 125 C

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top