BQ76920EVM

Mfr. #: BQ76920EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools Evaluation Module
Lifecycle: New from this manufacturer.
Datasheet: BQ76920EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ76920EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 25 V Input Voltage Output Voltage is 2.5 V Dimensions of 4.805 in x 4 in Output current: 15 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Compatible with BQ76920. The product can operate at a maximum temperature of + 30 C. The minimum operating temperature of this product is + 20 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.671409 oz of Unit Weight

BQ76920EVM Image

BQ76920EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ76920EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ76920
  • Input Voltage: 25 V
  • Output Voltage: 2.5 V
  • Description/Function: uC-controlled AFE family for 5/10/15-series cell li-Ion and phosphate evaluation module
  • Dimensions: 4.805 in x 4 in
  • Output Current: 15 A
  • Series: BQ78350
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • For Use With: BQ76920
  • Maximum Operating Temperature: + 30 C
  • Minimum Operating Temperature: + 20 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.671409 oz

BQ76920EVM

BQ76920EVM Specifications

BQ76920EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 25 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 2.5 V

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 4.805 in x 4 in.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 15 A

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, USB

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed BQ76920

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 30 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is + 20 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.671409 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top