| Mfr. #: | BQ76930EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | Power Management IC Development Tools Evaluation Module |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | BQ76930EVM Datasheet |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 26 V to 44 V Input Voltage Output Voltage is 2.5 V Output current: 15 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with EV2300, EV2400. The product can operate at a maximum temperature of + 30 C. The minimum operating temperature of this product is + 20 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.231710 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ76930EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Battery Management.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 26 V to 44 V.
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 2.5 V
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 15 A
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is USB.
A: At what frequency does the For Use With?
Q: The product For Use With is EV2300, EV2400.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 30 C.
A: Is the cutoff frequency of the product Minimum Operating Temperature?
Q: Yes, the product's Minimum Operating Temperature is indeed + 20 C
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 0.231710 oz.