CDCEL925PERF-EVM

Mfr. #: CDCEL925PERF-EVM
Manufacturer: Texas Instruments
Description: Clock & Timer Development Tools CDCEL925 Perf Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: CDCEL925PERF-EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCEL925PERF-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Clock Synthesizers type. Frequency range: 230 MHz Texas Instruments is a trusted brand for quality electronics Interface Type: USB 1.8 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

CDCEL925PERF-EVM Image

CDCEL925PERF-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCEL925PERF-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Clock Synthesizers
  • Tool Is For Evaluation Of: CDCEL925
  • Frequency: 230 MHz
  • Series: CDCEL9xx
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Voltage: 1.8 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

CDCEL925PERF-EVM

CDCEL925PERF-EVM Specifications

CDCEL925PERF-EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Clock Synthesizers.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 230 MHz.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 1.8 V.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Clock & Timer Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top