| Mfr. #: | CDCI6214EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | Clock & Timer Development Tools CDCI6214EVM |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | CDCI6214EVM Datasheet |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Clock Generators type. Frequency range: 100 MHz Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB 1.8 V to 3.6 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCI6214EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Clock Generators
A: What is the Frequency of the product?
Q: The Frequency of the product is 100 MHz.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: Is the cutoff frequency of the product Interface Type?
Q: Yes, the product's Interface Type is indeed I2C, USB
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 1.8 V to 3.6 V.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Clock & Timer Development Tools
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.