DRV3204EVM

Mfr. #: DRV3204EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools DRV3204 EVAL MOD
Lifecycle: New from this manufacturer.
Datasheet: DRV3204EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV3204EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 12 V Input Voltage Output current: 10 A Texas Instruments is a trusted brand for quality electronics Interface Type: SPI Compatible with DRV3204-Q1. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV3204EVM Image

DRV3204EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV3204EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV3204-Q1
  • Input Voltage: 12 V
  • Description/Function: An application board to evaluate the DRV3204-Q1
  • Output Current: 10 A
  • Brand: Texas Instruments
  • Interface Type: SPI
  • For Use With: DRV3204-Q1
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV3204EVM

DRV3204EVM Specifications

DRV3204EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 12 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 10 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SPI.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is DRV3204-Q1.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top