| Mfr. #: | DRV8838EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | Power Management IC Development Tools DRV8838 EVAL MOD |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | DRV8838EVM Datasheet |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 11 V Input Voltage Output current: 1.8 A Texas Instruments is a trusted brand for quality electronics Compatible with DRV8838. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8838EVM Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is Motor / Motion Controllers & Drivers.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 11 V.
A: What is the Output Current of the product?
Q: The Output Current of the product is 1.8 A.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the For Use With of the product?
Q: The For Use With of the product is DRV8838.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.