DS125BR111EVM

Mfr. #: DS125BR111EVM
Manufacturer: Texas Instruments
Description: Interface Development Tools DS125BR111EVM
Lifecycle: New from this manufacturer.
Datasheet: DS125BR111EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DS125BR111EVM Overview

This product is manufactured by Texas Instruments. Evaluation Kits This device belongs to the SMA type. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Interface Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.002324 oz of Unit Weight

DS125BR111EVM Image

DS125BR111EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DS125BR111EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Kits
  • Type: SMA
  • Tool Is For Evaluation Of: DS125BR111
  • Packaging: Bulk
  • Description/Function: 10 GbE, PCIe, SAS/SATA evaluation kit
  • Series: DS125BR111
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.002324 oz

DS125BR111EVM

DS125BR111EVM Specifications

DS125BR111EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Kits

  • A: At what frequency does the Type?

    Q: The product Type is SMA.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 85 C

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Interface Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.002324 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top