DS125BR820EVM

Mfr. #: DS125BR820EVM
Manufacturer: Texas Instruments
Description: Interface Development Tools DS125BR820EVM
Lifecycle: New from this manufacturer.
Datasheet: DS125BR820EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DS125BR820EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Repeater type. Texas Instruments is a trusted brand for quality electronics Compatible with DS125BR820NJY. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. 2.5 V, 3.3 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

DS125BR820EVM Image

DS125BR820EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DS125BR820EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Repeater
  • Tool Is For Evaluation Of: DS125BR820
  • Description/Function: 12.5 Gbps 8-channel repeater with equalization evaluation module
  • Series: DS125BR820
  • Brand: Texas Instruments
  • For Use With: DS125BR820NJY
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Operating Supply Voltage: 2.5 V, 3.3 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DS125BR820EVM

DS125BR820EVM Specifications

DS125BR820EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Repeater.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is DS125BR820NJY.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 2.5 V, 3.3 V

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Interface Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top