DS125DF111EVM

Mfr. #: DS125DF111EVM
Manufacturer: Texas Instruments
Description: Interface Development Tools 9.8-12.5Gbps Retimer Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: DS125DF111EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DS125DF111EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Retimer type. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: Serial Compatible with DS125DF111. 3.3 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

DS125DF111EVM Image

DS125DF111EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DS125DF111EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Retimer
  • Tool Is For Evaluation Of: DS125DF111
  • Packaging: Bulk
  • Description/Function: Dual channel retimer with integrated signal conditioning
  • Series: DS125DF111
  • Brand: Texas Instruments
  • Interface Type: Serial
  • For Use With: DS125DF111
  • Operating Supply Voltage: 3.3 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DS125DF111EVM

DS125DF111EVM Specifications

DS125DF111EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Retimer

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed Serial

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed DS125DF111

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Interface Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top