DS90UB949-Q1EVM

Mfr. #: DS90UB949-Q1EVM
Manufacturer: Texas Instruments
Description: Interface Development Tools DS90UB949-Q1 Evaluation Module
Lifecycle: New from this manufacturer.
Datasheet: DS90UB949-Q1EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DS90UB949-Q1EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Serializers / Deserializers type. The AEC-Q100 Qualification Texas Instruments is a trusted brand for quality electronics Interface Type: I2C 12 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory 1. 1.247619 oz of Unit Weight

DS90UB949-Q1EVM Image

DS90UB949-Q1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DS90UB949-Q1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Serializers / Deserializers
  • Tool Is For Evaluation Of: DS90Ux949-Q1
  • Qualification: AEC-Q100
  • Series: DS90UB949-Q1
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Operating Supply Voltage: 12 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 1.247619 oz

DS90UB949-Q1EVM

DS90UB949-Q1EVM Specifications

DS90UB949-Q1EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Serializers / Deserializers.

  • A: At what frequency does the Qualification?

    Q: The product Qualification is AEC-Q100.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 12 V

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Interface Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 1.247619 oz

40 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top