| Mfr. #: | EVM430-FR6989 |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | Development Boards & Kits - Other Processors Water meter ref Eval Module |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | EVM430-FR6989 Datasheet |


This product is manufactured by Texas Instruments. Evaluation Kits This product's MSP430 is an ARM Cortex M3. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, SPI, UART, USB This product has a Data Bus Width of 16 bit. 3.3 V operating supply voltage range Development Boards & Kits - Other Processors product type 1 of 100 Development Tools as subcategory The product's MSP430 is Blue Gecko.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

EVM430-FR6989 Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: What is the Product of the product?
Q: The Product of the product is Evaluation Kits.
A: Is the cutoff frequency of the product Core?
Q: Yes, the product's Core is indeed MSP430
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the Interface Type of the product?
Q: The Interface Type of the product is I2C, SPI, UART, USB.
A: Is the cutoff frequency of the product Data Bus Width?
Q: Yes, the product's Data Bus Width is indeed 16 bit
A: At what frequency does the Operating Supply Voltage?
Q: The product Operating Supply Voltage is 3.3 V.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Development Boards & Kits - Other Processors
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: At what frequency does the Tradename?
Q: The product Tradename is MSP430.