INA230EVM

Mfr. #: INA230EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools INA230 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: INA230EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
INA230EVM Overview

This product is manufactured by Texas Instruments. Evaluation Kits This device belongs to the Current Monitors & Regulators type. 5 V Input Voltage Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.143278 oz of Unit Weight

INA230EVM Image

INA230EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA230EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Kits
  • Type: Current Monitors & Regulators
  • Tool Is For Evaluation Of: INA230
  • Input Voltage: 5 V
  • Description/Function: The INA230EVM is a platform for evaluating the performance of the INA230 under various signal, shunt, and supply conditions.
  • Series: INA230
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.143278 oz

INA230EVM

INA230EVM Specifications

INA230EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Kits

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Current Monitors & Regulators

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, USB.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.143278 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top