LM10010EVM/NOPB

Mfr. #: LM10010EVM/NOPB
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools LM10010 EVAL MOD
Lifecycle: New from this manufacturer.
Datasheet: LM10010EVM/NOPB Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM10010EVM/NOPB Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the AC/DC Converters type. 3 V to 5.5 V Input Voltage Output Voltage is 0.7 V to 1.1 V Texas Instruments is a trusted brand for quality electronics Compatible with LM21215A-1. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

LM10010EVM/NOPB Image

LM10010EVM/NOPB

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM10010EVM/NOPB Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: AC/DC Converters
  • Tool Is For Evaluation Of: LM10010
  • Input Voltage: 3 V to 5.5 V
  • Output Voltage: 0.7 V to 1.1 V
  • Description/Function: VID voltage programmer for point of load regulator
  • Series: LM10010
  • Brand: Texas Instruments
  • For Use With: LM21215A-1
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LM10010EVM/NOPB

LM10010EVM/NOPB Specifications

LM10010EVM/NOPB FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed AC/DC Converters

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3 V to 5.5 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 0.7 V to 1.1 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is LM21215A-1.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top