LM36923EVM

Mfr. #: LM36923EVM
Manufacturer: Texas Instruments
Description: LED Lighting Development Tools LM36923 Eval Module
Lifecycle: New from this manufacturer.
Datasheet: LM36923EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM36923EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules Compatible with LM36923. This product's LM36923 is an ARM Cortex M3. 2.5 V to 5.5 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.133400 oz of Unit Weight

LM36923EVM Image

LM36923EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM36923EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: LED Lighting Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • For Use With: LM36923
  • Core: LM36923
  • Operating Supply Voltage: 2.5 V to 5.5 V
  • Series: LM36923
  • Packaging: Bulk
  • Brand: Texas Instruments
  • Product Type: LED Lighting Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.133400 oz

LM36923EVM

LM36923EVM Specifications

LM36923EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed LM36923

  • A: What is the Core of the product?

    Q: The Core of the product is LM36923.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 2.5 V to 5.5 V.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed LED Lighting Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.133400 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top