| Mfr. #: | LM8365EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | Power Management IC Development Tools LM8365EVM |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | LM8365EVM Datasheet |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Supervisory Circuits type. 1 V to 6 V Input Voltage Dimensions of 1.5 in x 1.15 in Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 1.740 lbs of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM8365EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Supervisory Circuits
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 1 V to 6 V
A: At what frequency does the Dimensions?
Q: The product Dimensions is 1.5 in x 1.15 in.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 1.740 lbs.