LMK04610EVM

Mfr. #: LMK04610EVM
Manufacturer: Texas Instruments
Description: Clock & Timer Development Tools EVM FOR LMK04610 ANALOG JITTER CLEANER
Lifecycle: New from this manufacturer.
Datasheet: LMK04610EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMK04610EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Clock Jitters type. Frequency range: 122.88 MHz Texas Instruments is a trusted brand for quality electronics Interface Type: USB 5 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

LMK04610EVM Image

LMK04610EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMK04610EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Clock Jitters
  • Tool Is For Evaluation Of: LMK04610
  • Frequency: 122.88 MHz
  • Description/Function: Evaluates the LMK04610 clock jitter cleaner
  • Series: LMK04610
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Voltage: 5 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LMK04610EVM

LMK04610EVM Specifications

LMK04610EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Jitters

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 122.88 MHz.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Clock & Timer Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top