LMK04832EVM

Mfr. #: LMK04832EVM
Manufacturer: Texas Instruments
Description: Clock & Timer Development Tools LMK04832EVM
Lifecycle: New from this manufacturer.
Datasheet: LMK04832EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMK04832EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Clock Distributions type. Frequency range: 122.88 MHz Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB 3.3 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

LMK04832EVM Image

LMK04832EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMK04832EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Clock Distributions
  • Tool Is For Evaluation Of: LMK04832
  • Frequency: 122.88 MHz
  • Packaging: Bulk
  • Series: LMK04832
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • Operating Supply Voltage: 3.3 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LMK04832EVM

LMK04832EVM Specifications

LMK04832EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Clock Distributions.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 122.88 MHz.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is SPI, USB.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Clock & Timer Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top