LMR23630EVM

Mfr. #: LMR23630EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools FLYING SHARK WSON EVM - LMR23630EVM
Lifecycle: New from this manufacturer.
Datasheet: LMR23630EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMR23630EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 4 V to 36 V Input Voltage Output Voltage is 1 V to 28 V Output current: 3 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko.

LMR23630EVM Image

LMR23630EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMR23630EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: LMR23630
  • Input Voltage: 4 V to 36 V
  • Output Voltage: 1 V to 28 V
  • Description/Function: Evaluates the LMR23630 buck regulator
  • Output Current: 3 A
  • Series: LMR23630DRR
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SIMPLE SWITCHER

LMR23630EVM

LMR23630EVM Specifications

LMR23630EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 4 V to 36 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 1 V to 28 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 3 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is SIMPLE SWITCHER.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top