| Mfr. #: | LMT01EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | Temperature Sensor Development Tools LMT01EVM |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | LMT01EVM Datasheet |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Temperature Sensor type. 5.5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: 1-Wire The product can operate at a maximum temperature of + 150 C. The minimum operating temperature of this product is - 50 C. Temperature Sensor Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.009008 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMT01EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Temperature Sensor.
A: At what frequency does the Operating Supply Voltage?
Q: The product Operating Supply Voltage is 5.5 V.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the Interface Type of the product?
Q: The Interface Type of the product is 1-Wire.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 150 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 50 C.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Temperature Sensor Development Tools
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.009008 oz