LMZ20502EVM

Mfr. #: LMZ20502EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools LMZ20502 EVAL MOD
Lifecycle: New from this manufacturer.
Datasheet: LMZ20502EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMZ20502EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the AC/DC Converters type. 2.7 V to 5.5 V Input Voltage Output Voltage is 1.8 V Dimensions of 64 mm x 27 mm Output current: 2 A Texas Instruments is a trusted brand for quality electronics Compatible with LMZ20502. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko. 1. 0.022743 oz of Unit Weight

LMZ20502EVM Image

LMZ20502EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMZ20502EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: AC/DC Converters
  • Tool Is For Evaluation Of: LMZ20502
  • Input Voltage: 2.7 V to 5.5 V
  • Output Voltage: 1.8 V
  • Dimensions: 64 mm x 27 mm
  • Output Current: 2 A
  • Series: LMZ20502
  • Brand: Texas Instruments
  • For Use With: LMZ20502
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SIMPLE SWITCHER
  • Unit Weight: 0.022743 oz

LMZ20502EVM

LMZ20502EVM Specifications

LMZ20502EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is AC/DC Converters.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 2.7 V to 5.5 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1.8 V

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 64 mm x 27 mm

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 2 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed LMZ20502

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Tradename?

    Q: The product Tradename is SIMPLE SWITCHER.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.022743 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top