LMZ21701EVM

Mfr. #: LMZ21701EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools LMZ21701 Eval Mod Board
Lifecycle: New from this manufacturer.
Datasheet: LMZ21701EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMZ21701EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 5 V to 17 V Input Voltage Output Voltage is 3.3 V Output current: 1 A Texas Instruments is a trusted brand for quality electronics Compatible with LMZ21701. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko. 1. 3.479 lbs of Unit Weight

LMZ21701EVM Image

LMZ21701EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMZ21701EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: LMZ21701
  • Input Voltage: 5 V to 17 V
  • Output Voltage: 3.3 V
  • Description/Function: Nano module evaluation board for LMZ21701
  • Output Current: 1 A
  • Series: LMZ21700
  • Brand: Texas Instruments
  • For Use With: LMZ21701
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SIMPLE SWITCHER
  • Unit Weight: 3.479 lbs

LMZ21701EVM

LMZ21701EVM Specifications

LMZ21701EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 5 V to 17 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 1 A

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed LMZ21701

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 125 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: Is the cutoff frequency of the product Tradename?

    Q: Yes, the product's Tradename is indeed SIMPLE SWITCHER

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 3.479 lbs.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top