LP5910DRV18EVM

Mfr. #: LP5910DRV18EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools LP5910DRV18EVM
Lifecycle: New from this manufacturer.
Datasheet: LP5910DRV18EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP5910DRV18EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 2.3 V to 3.3 V Input Voltage Output Voltage is 1.8 V Output current: 300 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.170111 oz of Unit Weight

LP5910DRV18EVM Image

LP5910DRV18EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP5910DRV18EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: LP5910-1.8DRVR
  • Input Voltage: 2.3 V to 3.3 V
  • Output Voltage: 1.8 V
  • Description/Function: Ultra low noise, 300 mA linear Regulator evaluation module
  • Output Current: 300 mA
  • Series: LP5910
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.170111 oz

LP5910DRV18EVM

LP5910DRV18EVM Specifications

LP5910DRV18EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is LDO Voltage Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 2.3 V to 3.3 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1.8 V

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 300 mA.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.170111 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top