OPT8241-CDK-EVM

Mfr. #: OPT8241-CDK-EVM
Manufacturer: Texas Instruments
Description: Distance Sensor Development Tool OPT8241-CDK-EVM
Lifecycle: New from this manufacturer.
Datasheet: OPT8241-CDK-EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
OPT8241-CDK-EVM Overview

This product is manufactured by Texas Instruments. Distance Sensor Development Tool product type Evaluation Modules This device belongs to the Time-of-Flight (ToF) Sensor type. 5 V operating supply voltage range The minimum operating temperature of this product is 0 C. The product can operate at a maximum temperature of + 40 C. Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB 1 of 100 Development Tools as subcategory

OPT8241-CDK-EVM Image

OPT8241-CDK-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

OPT8241-CDK-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Distance Sensor Development Tool
  • RoHS: N
  • Product Type: Distance Sensor Development Tool
  • Product: Evaluation Modules
  • Type: Time-of-Flight (ToF) Sensor
  • Operating Supply Voltage: 5 V
  • Tool Is For Evaluation Of: OPT8241, OPT9221
  • Minimum Operating Temperature: 0 C
  • Maximum Operating Temperature: + 40 C
  • Series: OPT8241
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

OPT8241-CDK-EVM

OPT8241-CDK-EVM Specifications

OPT8241-CDK-EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Distance Sensor Development Tool.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Time-of-Flight (ToF) Sensor.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed 0 C

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 40 C

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C, USB.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top