PCM5102EVM-U

Mfr. #: PCM5102EVM-U
Manufacturer: Texas Instruments
Description: Audio IC Development Tools PCM5102 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: PCM5102EVM-U Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PCM5102EVM-U Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio type. Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

PCM5102EVM-U Image

PCM5102EVM-U

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM5102EVM-U Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: E
  • Type: Audio
  • Tool Is For Evaluation Of: PCM5100
  • Series: PCM5102
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

PCM5102EVM-U

PCM5102EVM-U Specifications

PCM5102EVM-U FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top