TAS2560EVM

Mfr. #: TAS2560EVM
Manufacturer: Texas Instruments
Description: Audio IC Development Tools TAS2560EVM
Lifecycle: New from this manufacturer.
Datasheet: TAS2560EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS2560EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with TAS2560. Audio IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.204141 oz of Unit Weight

TAS2560EVM Image

TAS2560EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS2560EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TAS2560
  • Series: TAS2560
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: TAS2560
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.204141 oz

TAS2560EVM

TAS2560EVM Specifications

TAS2560EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifier.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is TAS2560.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.204141 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top