TAS2770EVM-STEREO

Mfr. #: TAS2770EVM-STEREO
Manufacturer: Texas Instruments
Description: Audio IC Development Tools TAS2770EVM-STEREO
Lifecycle: New from this manufacturer.
Datasheet: TAS2770EVM-STEREO Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS2770EVM-STEREO Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. 4.5 V to 16 V operating supply voltage range Output power: 18.3 W Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Audio IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.708118 oz of Unit Weight

TAS2770EVM-STEREO Image

TAS2770EVM-STEREO

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS2770EVM-STEREO Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TAS2770
  • Operating Supply Voltage: 4.5 V to 16 V
  • Output Power: 18.3 W
  • Series: TAS2770
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.708118 oz

TAS2770EVM-STEREO

TAS2770EVM-STEREO Specifications

TAS2770EVM-STEREO FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifier

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 4.5 V to 16 V

  • A: Is the cutoff frequency of the product Output Power?

    Q: Yes, the product's Output Power is indeed 18.3 W

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, USB

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.708118 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top