TAS5086-5142V6EVM

Mfr. #: TAS5086-5142V6EVM
Manufacturer: Texas Instruments
Description: Audio IC Development Tools HI PERF MULTI PWM
Lifecycle: New from this manufacturer.
Datasheet: TAS5086-5142V6EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS5086-5142V6EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TAS5086-5142V6EVM Image

TAS5086-5142V6EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5086-5142V6EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TAS5086, TAS5142
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TAS5086-5142V6EVM

TAS5086-5142V6EVM Specifications

TAS5086-5142V6EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifier.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top