TAS5612PHD2EVM

Mfr. #: TAS5612PHD2EVM
Manufacturer: Texas Instruments
Description: Audio IC Development Tools TAS5612PHD Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: TAS5612PHD2EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS5612PHD2EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. 16 V to 32.5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TAS5612PHD2EVM Image

TAS5612PHD2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5612PHD2EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TAS5612
  • Operating Supply Voltage: 16 V to 32.5 V
  • Description/Function: TAS5612PHD2EVM PurePath Premier Pro customer evaluation module demonstrates the integrated circuits TAS5612PHD
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Operating Supply Current: 16 A
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TAS5612PHD2EVM

TAS5612PHD2EVM Specifications

TAS5612PHD2EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifier

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 16 V to 32.5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, USB.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top