TAS6422Q1EVM

Mfr. #: TAS6422Q1EVM
Manufacturer: Texas Instruments
Description: Audio IC Development Tools TAS6424Q1EVM
Lifecycle: New from this manufacturer.
Datasheet: TAS6422Q1EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS6422Q1EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. 4.5 V to 26 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TAS6422Q1EVM Image

TAS6422Q1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS6422Q1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TAS6422
  • Operating Supply Voltage: 4.5 V to 26 V
  • Description/Function: Evaluates the TAS6422 class-D amplifier
  • Series: TAS6422-Q1
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TAS6422Q1EVM

TAS6422Q1EVM Specifications

TAS6422Q1EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifier.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 4.5 V to 26 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, USB.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top