THS1206M-EVM

Mfr. #: THS1206M-EVM
Manufacturer: Texas Instruments
Description: Data Conversion IC Development Tools THS1206M Eval Module
Lifecycle: New from this manufacturer.
Datasheet: THS1206M-EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS1206M-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. 3.3 V to 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.288510 oz of Unit Weight

THS1206M-EVM Image

THS1206M-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS1206M-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: ADC
  • Tool Is For Evaluation Of: THS1206
  • Operating Supply Voltage: 3.3 V to 5 V
  • Series: THS1206M
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.288510 oz

THS1206M-EVM

THS1206M-EVM Specifications

THS1206M-EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V to 5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.288510 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top