THS4215EVM

Mfr. #: THS4215EVM
Manufacturer: Texas Instruments
Description: Amplifier IC Development Tools THS4215 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: THS4215EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS4215EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory

THS4215EVM Image

THS4215EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4215EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: N
  • Brand: Texas Instruments
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

THS4215EVM

THS4215EVM Specifications

THS4215EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Amplifier IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top