THS4601EVM

Mfr. #: THS4601EVM
Manufacturer: Texas Instruments
Description: Amplifier IC Development Tools THS4601 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: THS4601EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS4601EVM Overview

This product is manufactured by Texas Instruments. Evaluation Kits Texas Instruments is a trusted brand for quality electronics Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory

THS4601EVM Image

THS4601EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4601EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: N
  • Product: Evaluation Kits
  • Tool Is For Evaluation Of: THS4601
  • Series: THS4601
  • Brand: Texas Instruments
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

THS4601EVM

THS4601EVM Specifications

THS4601EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Amplifier IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top