THS6012EVM

Mfr. #: THS6012EVM
Manufacturer: Texas Instruments
Description: Other Development Tools THS6012 Hi-Spd Amp Eval Mods
Lifecycle: New from this manufacturer.
Datasheet: THS6012EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS6012EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Driver/Receiver type. Texas Instruments is a trusted brand for quality electronics 5 V to 15 V operating supply voltage range Other Development Tools product type 1 of 100 Development Tools as subcategory

THS6012EVM Image

THS6012EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS6012EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Other Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Driver/Receiver
  • Tool Is For Evaluation Of: THS6012
  • Series: THS6012
  • Brand: Texas Instruments
  • Operating Supply Voltage: 5 V to 15 V
  • Product Type: Other Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

THS6012EVM

THS6012EVM Specifications

THS6012EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Driver/Receiver.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V to 15 V.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Other Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top