TIC12400EVM-KIT

Mfr. #: TIC12400EVM-KIT
Manufacturer: Texas Instruments
Description: Interface Development Tools TIC12400 EVALUATION MODULE AND SWITCH BD
Lifecycle: New from this manufacturer.
Datasheet: TIC12400EVM-KIT Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TIC12400EVM-KIT Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Multiple Switch Detection Interface type. Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB 12 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

TIC12400EVM-KIT Image

TIC12400EVM-KIT

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TIC12400EVM-KIT Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Multiple Switch Detection Interface
  • Tool Is For Evaluation Of: TIC12400
  • Series: TIC12400-Q1
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • Operating Supply Voltage: 12 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TIC12400EVM-KIT

TIC12400EVM-KIT Specifications

TIC12400EVM-KIT FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Multiple Switch Detection Interface

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is SPI, USB.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 12 V.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Interface Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top