TL1963A-33EVM

Mfr. #: TL1963A-33EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TL1963A-33EVM
Lifecycle: New from this manufacturer.
Datasheet: TL1963A-33EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TL1963A-33EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the LDO Voltage Regulators type. 20 V Input Voltage Dimensions of 63.5 mm x 63.5 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TL1963A-33EVM Image

TL1963A-33EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TL1963A-33EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TL1963A-33
  • Input Voltage: 20 V
  • Dimensions: 63.5 mm x 63.5 mm
  • Series: TL1963A
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TL1963A-33EVM

TL1963A-33EVM Specifications

TL1963A-33EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is LDO Voltage Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 20 V.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 63.5 mm x 63.5 mm.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top