TL4242EVM-543

Mfr. #: TL4242EVM-543
Manufacturer: Texas Instruments
Description: LED Lighting Development Tools TL4242EVM-543 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: TL4242EVM-543 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TL4242EVM-543 Overview

This product is manufactured by Texas Instruments. Evaluation Modules Compatible with High Power LEDs. This product's TL4242 is an ARM Cortex M3. 42 V operating supply voltage range Output current: 500 mA Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 150 C. The minimum operating temperature of this product is - 40 C. LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory

TL4242EVM-543 Image

TL4242EVM-543

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TL4242EVM-543 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: LED Lighting Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • For Use With: High Power LEDs
  • Core: TL4242
  • Operating Supply Voltage: 42 V
  • Series: TL4242
  • Output Current: 500 mA
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 150 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: LED Lighting Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TL4242EVM-543

TL4242EVM-543 Specifications

TL4242EVM-543 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is High Power LEDs.

  • A: What is the Core of the product?

    Q: The Core of the product is TL4242.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 42 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 500 mA.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 150 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is LED Lighting Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top